A shipyard audit rarely fails on paperwork alone. It fails on one bundle a surveyor cannot tie back to a heat number. Here is the routine that closes that gap.
Prepare for a shipyard audit by reconciling three items bundle by bundle: the mark on the angle, the heat number on the EN 10204 3.1 certificate, and the quantity in the stock register. Then prove the link by reverse-tracing three random bundles from the report back to the steel.

Most yards I visit begin preparing for the survey about two weeks before it happens, and they begin in the wrong room. They print certificates, tidy the quality binder, and rehearse answers about weld procedures. Then the surveyor walks into the steel bay, puts a hand on a bundle of L100×100×10, and asks a question no binder can answer: where did this bar come from, and who has the paper that proves it? That single question is the audit, and everything before it is preparation.
What Does a Shipyard Surveyor Actually Check in the Steel Store?
Most yards prepare for the wrong audit. They tidy the paperwork and leave the steel untouched. A hull surveyor walks the bay first and reads the bundles second.
A hull surveyor checks four things in the steel store: whether incoming steel was registered on arrival, whether grades and sizes are segregated under clear marks, whether the certificate matches the mark on the bar, and whether cut remnants still carry their original identity.
The Four Points That Decide the Walk-Through
The checks are not secret. They are written into classification society survey practice and into IACS Unified Requirement Z23, which treats steel surface treatment, marking and cutting as a surveyed shipbuilding function rather than a housekeeping matter. In practice the surveyor does four things, in this order.
First, they confirm that steel entering the yard was registered when it arrived. Not when it was needed. When it arrived. A yard that books steel a month late has material on the floor that the system does not know about, and unidentified material is the finding that opens every other question.
Second, they check whether the different grades and sizes are clearly marked and stored separately. This matters more with angle than with plate, because AH36 angle and grade A angle of the same leg and thickness look identical from three metres away. If the yard does not separate them physically, the surveyor assumes the yard cannot separate them at all.
Third, the surveyor spot-checks a certificate against the markings on the steel body itself. Not against the packing list, not against the register. Against the bar. Specification, grade and heat number have to agree, and they have to be readable.
Fourth, the surveyor looks at what happened after the steel left the rack. Mark transfer at cutting, part numbering, and whether the offcut still carries its original identity. A yard that can produce a perfect certificate for a bundle and no trail for the parts cut from it has solved the easy half of the problem.
Why “Registered on Arrival” Is the First Question
I have watched a surveyor spend forty minutes in one bay and never open the quality manual. He was not checking whether the yard had a procedure. He was checking whether the procedure had been used. The date on the goods-in record against the date on the vessel discharge note told him more than any document title.
High-strength angle gets extra attention. Surveyors expect a separate identification method for AH32 and AH36, so that a fitter can tell it from mild steel without reading a tag. The usual practice is a painted end band or a distinct stencil colour, recorded in the yard’s marking procedure. When I ship angle to a yard, I ask which end they want the mill mark on, because a mark in the wrong place is a mark that disappears after the first cut.
The Reverse-Trace Test
The real test is not forward traceability. Everyone can walk from a bundle to a certificate. The test is backward: the surveyor picks three cut parts at random, and asks the yard to trace each one back to the bundle, the heat and the certificate. I do the same thing in my own warehouse before a shipment leaves Liaocheng, and it takes about twenty minutes for three bundles. If it takes a day, the system is held together by the person who runs it, not by the record.
| What the surveyor asks | What they actually open | What usually fails |
|---|---|---|
| When did this steel arrive? | Goods-in register against the discharge note | Receipt booked weeks late, or split across two lines |
| Is this grade segregated? | Physical bay layout and bay signage | AH36 stored beside grade A with no end marking |
| Does the certificate match this bar? | MTC 3.1 against the stencil on the web | Grade on cert reads AH36, stencil reads A, tag says AH36 |
| Where did these cut parts come from? | Part list, cut list, remnant register | Piece numbers with no heat number carried forward |
| What about this offcut? | Remnant bay and remnant register | 7 m offcut unmarked, no parent heat, no location |
| Who approved this steel? | Supplier approval list | Mill not on the yard’s approved supplier list |

How Do You Build a Heat-Number Link That Survives the Audit?
Certificates rarely fail because they are fake. They fail because nobody can connect them to the steel standing in bay four.
Build the link at goods-in: record the heat number from the bar mark, the certificate number and the bundle weight on one receipt line, then file the certificate under that heat. Every later movement copies the heat number forward instead of re-typing the grade.
What EN 10204 3.1 Actually Promises
A Type 3.1 certificate is an inspection certificate with specific results for the products delivered. The word specific carries the weight. The chemistry and mechanical values must come from testing that relates to the delivered lot, not from general production data, and the document must be validated by an authorised representative of the manufacturer who is independent of the production department.
That independence is structural, not decorative. A production manager cannot sign off on material his own line made. When I audit a new mill, I ask one question before anything else: who signs the 3.1, and who do they report to? A mill that answers in ten seconds is a mill that has thought about it.
Type 2.2 is a different document. The results are not specific to your lot, and it is not a substitute for 3.1 on hull structural steel. Type 3.2 is 3.1 plus independent third-party witnessing, which is what buyers normally mean when they ask for SGS or BV involvement.
Seven Fields That Fail First
Most certificate problems cluster in the same seven places. I check them in this order, because this is the order they break in.
| Field | What the auditor compares | Typical failure |
|---|---|---|
| Heat number | Certificate against the stamp on the bar | Cert covers heat K-24817, no shipped bar carries that number |
| Signatory | A named person with a role | Stamp only, no name, no title |
| Independence | Signatory’s department | Signature from production, not quality |
| Standard edition | EN 10204:2004 | Certificate still cites the 1991 edition |
| Inspection basis | Specific results for the lot | Batch averages presented as 3.1 values |
| Signature | Present on the page | Unsigned PDF, or signature page missing |
| Result spread | Values vary between heats | Every heat pinned exactly at the minimum |
The last one is the quietest. If the minimum tensile is 490 MPa for AH36 and five heats all read 490 MPa, the laboratory is not measuring, it is copying. An experienced surveyor notices, and so should you.
Where the Link Breaks Inside an Angle Yard
Plate yards break traceability at the flame cutter. Angle yards break it earlier and more often, because angle gets handled in bundles and split for kits. There are four common break points.
Splitting a bundle for a small kit creates two children from one parent, and the child usually gets a handwritten tag with the size only. Blasting and priming removes the stencil if the mark sits on a face the line touches. Cutting a 12 m bar into a 4.2 m part leaves a remnant that nobody thinks of as inventory. And re-tagging after a site move turns a heat-tagged bundle into a size-tagged bundle, which is exactly the downgrade an auditor is trained to spot.
The fix is boring. One receipt line per heat and per bundle, heats copied forward on every transaction, and a rule that a child record cannot exist without the parent heat. Once that rule is enforced, the rest is discipline.
The One-Page Heat Sheet
For every heat in stock, I keep a single page: heat number, grade, sizes rolled from that heat, bundle numbers, theoretical and weighed mass, certificate number, current bay location, and quantity remaining. When a surveyor picks a bar, I can answer in one page instead of four systems.
That page is also how I catch the nested-bundle problem. A bundle that was consolidated from two heats looks clean on the outside and carries one tag. Weighing it against the theoretical mass is usually what exposes the second heat, and a heat gap of more than about two percent on angle is worth opening the bundle for.
Which Physical Checks Turn a Tidy Store into an Auditable One?
Paint fades, tags fall off, and a 12 m bar becomes a 7.7 m remnant in ten minutes. Physical control is where most audits lose points.
An auditable angle store has four physical controls: one tag per bundle carrying size, grade and heat; a fixed stencil position that survives blasting and cutting; a remnant register that names the parent heat; and a quarantine bay for steel that cannot be identified or does not conform.
Mark Position Beats Mark Quality
Everyone argues about paint pens. Almost nobody argues about position, and position is the part that survives.
On angle, the sustainable place for the stencil is the web, roughly 100 to 150 mm from the end, on the same end of every bar in the bundle. The leg faces get cut, ground, butted and welded. The web usually survives long enough to be read at the saw. If the yard also paints an end band on high-strength steel, the band goes on the opposite end so the two marks do not compete for the same 200 mm.
Faded marks are not a cosmetic issue. A stencil that can no longer be read turns certified steel into unidentified steel, and unidentified steel is either quarantined or used on a non-structural part. Both outcomes cost more than the paint. Re-marking is allowed when the yard has a written procedure, signs it, and logs the re-mark against the original heat. Re-marking without a log is worse than a faded mark, because now the record and the steel disagree.

Count, Weigh, Then Explain the Gap
Angle is bought by weight and counted by piece, and the two numbers rarely match exactly. That is normal. What is not normal is discovering it in front of the surveyor.
Take L100×100×10, the size that appears in almost every marine angle steel order. The section table gives 15.12 kg/m, so a 12 m bar is 181.4 kg, and a 300-bar bundle is 54.4 t theoretical. Put that bundle on a weighbridge and 55.6 t is a perfectly ordinary result, about two percent high, because mills roll to the positive side of the thickness tolerance. If your stock report says 54.4 t and the scale says 55.6 t, you do not have a shortage. You have an unexplained variance, which is a finding until somebody writes down why.
The dimensions matter for the same reason. EN 10056-2 sets leg and thickness tolerances that allow a bar to be inside specification and still visibly different from the bar beside it. Straightness is the one that surprises buyers: 0.4 percent of length is the normal mill tolerance, which is 48 mm of bow on a 12 m bar, and 0.2 percent when the order asks for closer control. Neither number is a defect. Both numbers look like a defect to somebody holding a string line for the first time.
| Check | Tool | Normal acceptance | What it looks like if you never recorded it |
|---|---|---|---|
| Leg length | Steel rule or caliper | Within EN 10056-2 leg tolerance | Fit-up gap on every butt, blamed on the fabricator |
| Leg thickness | Micrometer at three points | Within EN 10056-2 thickness tolerance | Weight variance nobody can explain |
| Straightness | String line over full length | 0.4% of length, 0.2% on tight orders | 48 mm bow read as a supplier defect |
| Squareness | Try square at the corner | 90° ± 1° | Root gap that closes on one side of the joint |
| Length | Tape, end to end | Mill length tolerance, +50/0 mm typical | Nesting loss blamed on the saw |
| Mass | Weighbridge against theoretical | Typically 0 to +3% for rolled angle | Audit finding raised as a quantity dispute |
The Remnant Problem
A 12 m bar cut to a 4.2 m part leaves 7.75 m after kerf and end trim. At 15.12 kg/m that offcut is 117 kg, and on a 300-bar order the remnant pile is 35 t of certified steel that most yards do not count.
The audit question is not whether remnants exist. It is whether they are identifiable. A remnant that still carries the original stencil, or a transfer mark tied to the parent heat, is an asset. A remnant with a chalk size and nothing else is unidentified material sitting in the same bay as new stock, and a surveyor who finds one will ask how many others there are.
My rule is simple: a remnant goes back to the rack only with its parent heat and its length written on it, and it goes into the register as a child line of the original bundle. Class A remnants above 3 m stay in the picking rack. Class B between 1 and 3 m go to a remnant bay with a bay code. Class C below 1 m are scrap or brackets, decided at the saw, not later.
Quarantine and the Cost of One Unidentified Bundle
Every yard needs one small, signed, physically separated area for steel that cannot be identified, is damaged, or is under a nonconformity. It does not need to be large. It needs to exist, be marked, and have a log with an owner and a disposition date.
One unidentified bundle in a 240 t stock is not a 0.4 percent problem. It is evidence that the identification system has a hole, and the surveyor will widen that hole on purpose. I would rather declare a single bundle as quarantined, with a written reason and a date, than have it found sitting in the pick rack with a torn tag.
What Belongs in the Audit Pack Before the Surveyor Arrives?
The surveyor gives you a date, not a checklist. The pack you hand over in the first ten minutes sets the tone for the whole survey.
The audit pack holds seven documents: the purchase order, an EN 10204 3.1 certificate for every heat, a packing list per bundle, the goods-in receipt with weighed mass, the mark-transfer procedure, the remnant register, and the nonconformity log. Add a stock report that ties each bundle to a bay location.
Seven Documents, One Index
The pack fails when it is complete but unindexed. Two hundred certificates in a folder is not evidence, it is a search problem. I put a one-page index at the front: heat number, grade, size, bundle, certificate page, bay. The surveyor picks a bar, I read one line, and the certificate is in their hand in under a minute.
The documents buyers forget are the boring ones. The goods-in receipt with the weighed mass, because it is the only record that connects the packing list to reality. The mark-transfer procedure, because a procedure with a revision date and a signature is what turns a paint pen into a controlled process. And the nonconformity log, because a yard with an empty log either has no problems or is not recording them, and surveyors know which is more likely.
The Ten-Minute Retrieval Test
Before every survey I run the same drill. I pick three bundles from the stock report using a random number, not a familiar one, and I ask the warehouse team to produce the certificate, the receipt and the bay location for each. Ten minutes total, or the system is not ready.
The drill exposes the difference between a record and a habit. If the answer depends on one supervisor’s memory, the yard passes today and fails the next audit after that supervisor moves shift. If the answer comes from an index that anyone can read, the yard has something durable.
I learned this from a buyer rather than a surveyor. Gulf Metal Solutions in Dammam asked us for a photo of the heat marking next to the packing list on a plate order, and the request changed how we document every shipment out of Liaocheng. If a distributor can ask for that on a Tuesday afternoon, a classification surveyor will ask for it in person. Our own third-party inspection support follows the same logic: the photo is taken at the bundle, not recreated in the office afterwards.
What to Fix in the Last Week, and What Not To
In the last week, fix gaps you can prove and document. Photograph every bundle tag. Reconcile the stock report to the physical count bay by bay. Write down every variance with a reason code, even the ones you cannot fully explain yet. Declare quarantined material before it is found.
Do not re-stencil the whole warehouse the night before. Fresh paint on bars that sat untouched for a year raises a question about what the old mark said, and inconsistent new marks raise a worse one. If a mark is faded, re-mark it under the procedure and log it. If a mark is missing, move the bundle to quarantine and say so. A declared gap is a management decision. A hidden gap is a finding.
The system you choose decides how much of this work repeats every audit. The table below compares the four setups I see in yards of different sizes, from a paper register to a barcode tag on every bundle.

| Setup | Heat-level link | Retrieval time per bundle | Remnant control | Audit evidence | Typical failure |
|---|---|---|---|---|---|
| Paper register and filing cabinet | Possible, rarely maintained | 20–60 minutes, depends on one person | None beyond a chalk mark | Signed sheets, weak version control | Records lag the physical move by weeks |
| Spreadsheet with heat column | Good, if the column is mandatory | 3–10 minutes | Manual, easily skipped | Printouts, no audit trail | Duplicate bundle IDs after a copy-paste |
| ERP or WMS with heat as a required field | Strong, enforced at transaction | Under 2 minutes | Child lines with parent heat | Transaction history and user stamps | Untrained staff overriding fields |
| Barcode or QR tag per bundle | Strong, plus physical scan evidence | Under 1 minute | Scan-driven, hard to bypass | Scan log ties steel to record | Tag damage, no fallback procedure |
Conclusion
An audit is a retrieval test, not a paperwork test. Tie every bundle to a heat, keep the marks readable, and the surveyor’s random picks land on solid ground.